Skip to main content

GreenGuard

Running

Running

Prime contractor
Organisational Unit
Activity Type
21 March 2025

Duration: 6 months

Objective

Parting from Redwire's latest smallsat platform design iteration baselined for upcoming missions such as ALTIUS and IOD (element 1), this study proposes to build upon lessons learned in previous PROBA mission LCA assessments, and evaluate potential design changes and implementation of eco-design and sustainability-focused measures applied to a next generation, low-cost platform for commercial applications.

Contract number
4000147851
Programme
OSIP Idea Id
I-2024-10312
Related OSIP Campaign
EcoSTAR: an ecodesigned platform SysNova Campaign
Main application area
Space Safety
Budget
100000€
GreenGuard